| 1. What is the volume of waste to be processed? |
| |
| 2. What are the characteristics of the waste? |
|
| a) Wet/Dry |
| b) Abrasive |
| c) Size of Waste |
| |
| 3. Where is the Compactor to be Located? |
| a) Is there room for a full size compactor and container? |
| b) Is there enough access for a Roll-Off Hoist or Front Loader to service the unit? |
c) Will the unit require a concrete pad of skid plates? (Concrete Pad: 35' x 102" x 6") |
| d) Will the unit require guide rails? |
| e) Where will the power unit be located? |
| |
| 4. How will the Waste be Charged? |
| a) Cabinet Style |
| b) Rear through the Wall |
| c) Side through the wall |
| d) Side Weather Enclosure |
| e) Rear Walk-In Weather Enclosure |
| f) Walk-On or Drive-On Dock |
| g) Through-the-Wall Grab Assembly |
| h) Cart Dumping System |
| i) Stacked Compactors |
| |
| 5. Compactor Options to Consider |
| Jog Control |
| Power Pack Cover |
| Pressure Gauges |
| Security Door & Collars |
| Photo Electric Eye |
| Pin-Off Tubes |
| Remote Power Unit |
| Cycle Timer |
| Full Light |
| Tank Heater |
| |
| 6. Electrical |
| a) What is the voltage? |
| b) Is it single or 3 phase? |
| c) Will a disconnect on the wall be required? |
| |
| 7. Who is Doing What? |
| a) Who will be doing the alterations? |
| b) Who will install the Compactor? |
| c) Who will do the Electrical |